Towards Integration of Carbon Capacitors in Industrial Wafer Fabrication
Reference number | |
Coordinator | SMOLTEK AB |
Funding from Vinnova | SEK 112 732 |
Project duration | November 2020 - March 2021 |
Status | Completed |
Venture | The strategic innovation programme Electronic Components and Systems: |
Important results from the project
The unfortunate outcome of the project is that no consortium could be formed to apply for "smarter electronics" the call this spring. The major factors, which led to this result are the short project time, the prevailing pandemic situation and the fact that interested partners who were found identified and contacted did not eventually qualify as co-applicants to participate in the consortium that was considered to be able to apply for the “smarter electronics” calls for proposal.
Expected long term effects
Although the project did not result in forming a consortium to apply for the next call in the frame of "smartare elektronik", the project helped to broaden the awareness around CNF-MIM among end-users and to increase the possibilities for faster integration of CNF-MIM on 200 and 300 mm wafers, by establishing deeper contact with HVM CVD manufacturers and semiconductor foundries. Collaborations and interactions between Smoltek and several of such parties continue but outside the framework of "smartare elektronik".
Approach and implementation
The project focused specifically on three types of possible partners to develop a consortium for the application in the next "smarter electronics" call: foundries, process equipment manufacturers and end users of the technology. Specific substrates for demonstration of CNF growth in a CVD system at a supplier were manufactured. However, due to the Covid 19 pandemic, the demo could not be completed in time. However, the project helped to broaden the awareness around CNF-MIM among end-users and to establish deeper contact with HVM CVD manufacturers and semiconductor foundries.