Important results from the project

The goal was both to get a better picture of where Infrasonik stands in terms of IP today and to develop a strategy and working method going forward to secure Infrasoniks IP-position. It was well stated from the beginning that the delivery would also be a product that we will have practical use of in the form of a decision support. Rouse has taken the entire technology platform into account and analyzed the various assets associated with each subsystem. A strategy for how the various assets should be protected has been developed, as well as a process for how Infrasonik will work forward with IP.

Expected long term effects

The result is both a strategic document and a process map. The project has both raised the level of knowledge of infrasonic connected to IP, identified areas that should be strengthened from an IP perspective and contributed with long-term working methods to ensure a long-term perspective where Infrasonik itself can identify the right measures at the right times.

Approach and implementation

** Denna text är maskinöversatt ** The project was planned and managed by Rouse, but Infrasonik had a large participation through interviews and workshops. Other external stakeholders were also interviewed to ensure that all dimensions were really captured. It was a very good approach because Rouse´s structure, knowledge and analytical skills (and outside perspective) in combination with Infrasonik´s own deep knowledge of the technology and its surroundings could be met in an effective way. The result is something that Infrasonik will really use in its activities.