Future Fossil Free Rock Loading Solution

Reference number
Coordinator Volvo Construction Equipment AB
Funding from Vinnova SEK 4 240 000
Project duration May 2022 - December 2025
Status Ongoing
Venture Fossilfria Arbetsmaskiner - FFI

Purpose and goal

** Denna text är maskinöversatt ** The rock material industry is one of the 21 industries that participate and together these 21 cover more than 70 percent of the emissions in Sweden. Achieving the high environmental goals in rock material production requires not only a transition to fossil- and emission-free operations, but also new thinking in terms of process and new machine concepts. The approach is to develop a new system solution for rock unloading that takes into account the boundary conditions that electrification entails.

Expected effects and result

** Denna text är maskinöversatt ** The long-term goal is to make the ballast production chain fossil-free. The subsystem in focus of this project is the process that accounts for the majority of the remaining fossil fuel use today, as there are solutions for electrified crushers, conveyor belts and sorting plants. It is estimated that this project could cover 1/3 of the 60% that is the share of transport in the table above or approximately 84 - 152 thousand tonnes of CO2 equivalent in Sweden. Including both mobile and fixed crushers enables that result can be used in most quarries. globally.

Planned approach and implementation

** Denna text är maskinöversatt ** The project is divided into work packages. The goal is to run a new machine concept and energy supply system on site in the final part of the project, .