FTTH using Micro Trenching
Reference number | |
Coordinator | DELLCRON AB |
Funding from Vinnova | SEK 1 000 000 |
Project duration | June 2011 - March 2013 |
Status | Completed |
Important results from the project
To develop and document a large scale industrial method for restoring roads and pavements after fiber has been installed using the method ´Micro Trenching´. The project will result in choice of suitable materials for filling and sealing of the trench and in choice of and modification of equipment for application of both materials, documentation of the method and if possible a patent application.