Cost-efficient and environmentally friendly chloride protection and chloride removal from concrete in P-houses
Reference number | |
Coordinator | CBI Betonginstitutet AB - CBI Betonginstitutet AB - Borås |
Funding from Vinnova | SEK 200 000 |
Project duration | August 2012 - March 2013 |
Status | Completed |
Important results from the project
The planning grant shall be used to verify the methodology for removal of chlorides from concrete P- Houses and provide facts about the various concrete quality limits for chloride levels where reduction to acceptable levels is possible, the ongoing reinforcement corrosion is affected by the treatment and how well the penetration of chlorides can be stopped.