Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

BiteLock-wood construction without fasterners

Reference number
Coordinator Woodbe Engineering AB
Funding from Vinnova SEK 300 000
Project duration April 2021 - December 2022
Status Completed
Venture Innovative Startups
Call Innovative Startups step 1 spring 2021

Important results from the project

The aim has been fulfilled by carrying out the experimental tests and the virtual setups as planned. The objective has been met by the fact that comparisons have been carried out to verify and create an idea of the performance in terms of the shear and tensile capacity between the experimental tests and the virtual tests.

Expected long term effects

The result was positive as the BiteLock system demonstrated a good performance in terms of the shear and tensile capacity. The expectation was that the virtual setup would more closely mirror the experimental tests . However, the results from the two different setups show correlations in similar load-bearing capacity. Deeper analyzes need to be carried out to clarify more specific relationships.

Approach and implementation

The setup for carrying out the tests proved to work well. There were implementation issues with delivery delays and delays in the development of the BiteLock system.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 27 January 2023

Reference number 2021-00640