Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Bikeable city - model for urban area development for active transport and everyday exercise

Reference number
Coordinator Trivector Traffic AB - Trivector Traffic AB Stockholm
Funding from Vinnova SEK 500 000
Project duration April 2019 - February 2020
Status Completed
Venture Challenge-Driven Innovation – Stage 1 initiation
Call Challenge-Driven Innovation stage 1 initiation – 2019

Important results from the project

The objective of the first step of the project was to lay a solid foundation for a project that will create a system solution capable of transferring broad knowledge, bridging obstacles and implementing bicycle promotion planning aimed at increasing physical activity and public health. The objective has been achieved for all sub-projects through a careful external monitoring which gave a good picture of the most important actors as well as a deeper understanding of the problem picture and the sub-solution. In workshops, the problem picture and solutions were discussed with the actors.

Expected long term effects

The expected results and effects have largely been met. Certain sub-solutions have been redesigned after step 1 as a result of both external monitoring and workshops with actors and problem owners, both of which contributed to a deeper understanding of the problem picture and sub-solutions. The interest from the invited actors to participate in the next step was good, although not all actors have the opportunity to set aside time to participate, they welcome the implementation of the project and welcome the results.

Approach and implementation

Our setup with an initial external monitoring and reading of scientific literature turned out to be a good arrangement because it generated both new actors, new knowledge and in-depth questions. These three elements were then taken to a thematic workshop where the issues were discussed together with important actors who at the same time gained greater involvement in the project. One part of the workshop was a SWOT exercise where a simpler market analysis could be performed together with actors and problem owners.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 20 March 2020

Reference number 2019-00896