Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

An updated set of regulations for adapting the transport infrastructure to future requirements

Reference number
Coordinator Implementeringskommissionen För Europastandard Inom Geoteknik 20
Funding from Vinnova SEK 1 260 000
Project duration May 2023 - May 2025
Status Ongoing
Venture The strategic innovation program InfraSweden
Call SIP InfraSweden - autumn 2022: Adapting the transport infrastructure to meet climate change

Purpose and goal

The project idea is that updated regulations are a prerequisite for limiting the negative effects of climate change by adapting new and existing transport infrastructure. The project contributes in the development of this updated regulation and implementing it. The updated regulation must: create the possibilities, be supplemented with guidance and an industry-wide consensus, be open to new innovative solutions, be tested to ensure that it opens up for adaptations and limits negative effects.

Expected effects and result

The project is expected to give increased knowledge about how to use prescriptive rules and the Observational Method for design and excution of adaptation of the transport infrastructure. The project will also identify tools for managing goal conflicts. The results create a basis for the owners of the needs to update the regulations together with the industry to enable the sustainable transport infrastructure of the future. The deliverables from the work packages include: workshops, work reports and materials for guidance, courses and national elections.

Planned approach and implementation

The work is planned for year 2023 to 2025 in five work packages with a focus on creating tools to deal with goal conflicts in a methodical way, write guidelines for the design of infrastructure facilities with regard to climate adaptation, using verification with prescriptive rules and the Observational Method as tool for innovative solutions, and test-running the updated regulations on type constructions. The work is carried out as part of the industry-wide collaboration within IEG 2.0.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 24 May 2024

Reference number 2023-00157

Page statistics